The site survey, captured once in the field so the project team, the install crew, and the customer are reading the same record.
Site survey record — illustrative
- Door / access width
- Measured in the field
- Corridor & elevator path
- Recorded with photos
- Service clearances
- Checked against the spec
- Utility rough-ins
- Gas · electric · water · drain
- Readiness gaps
- Flagged before delivery day



